Scope 3: Current measures

Energy savings

Year Measures in progress
current

Possible decarbonization of steam generation

current

Possible decarbonization of vulcanization press heating

Sustainability
PV Werbefoto 24

Scope 3: Measures implemented

Energy savings

Year Measures successfully implemented
2024

Complete renovation of the customer entrance building

2023

Expansion of the PV system to 207.7 kWp

2022

Installation of a heat pump with geothermal probes

Purchase of another electric car

Electrification of the hot water circuit

2020

Installation of a PV system with 97.8 kWp

Renovation/insulation of the flat roofs

Purchase of a first electric car

2016

Conversion of operational lighting to LED lamps

2012

Renovation/replacement of all old windows and doors

2008

Renewal of operational ventilation with heat recovery

2007

Investment in a new modulating gas burner

2006

Investment in closed cooling circuits with air heat exchangers

2005

Dismantling of the oil heating in the «Durisol building»

2003

Replacement of open water cooling systems with dry-running seals

2000

Renovation/insulation of the entire building